Division 2: Earthwork
All files are in pdf format. To read pdf files, you may need to download the free Adobe Acrobat Reader.
Section 2010: Clearing, Excavation, and Embankment
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Submittals
- 1.04 Substitutions
- 1.05 Delivery, Storage and Handling
- 1.06 Scheduling and Conflicts
- 1.07 Special Requirements
- 1.08 Measurement for Payment
Part 2: Products
- 2.01 Clearing and Grubbing
- 2.02 On-site Topsoil
- 2.03 Excavation Materials
- 2.04 Embankment Materials
- 2.05 Compaction Equipment
- 2.06 Dust Control
Part 3: Execution
- 3.01 Preparation by the Contractor
- 3.02 Clearing and Grubbing
- 3.03 Stripping, Salvaging, and Spreading Topsoil
- 3.04 Excavation
- 3.05 Embankment Construction
- 3.06 Unsuitable Soils
- 3.07 Subgrade Preparation
- 3.08 Subgrade Treatment
- 3.09 Granular Subbase (Class A, B, C, & D)
- 3.10 Field Quality Control
- 3.11 Fixture Adjustment
- 3.12 Temporary Erosion Control During Construction
- 3.13 Dust Control
- 3.14 Pavement Replacement
Figures
Details of Embankment and Rebuilding
Embankments 2010.1A
Details of Embankment (Allowable Placement
Of Unsuitable Material) 2010.1B
Roadway Earthwork
2010.2
Soils Measurement and Recording Devices 2010.3

