Section 2010: Clearing, Excavation, and Embankment

Part 1: General

1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement for Payment

Part 2: Products

2.01 Clearing and Grubbing
2.02 On-site Topsoil
2.03 Excavation Materials
2.04 Embankment Materials
2.05 Compaction Equipment
2.06 Dust Control

Part 3: Execution

3.01 Preparation by the Contractor
3.02 Clearing and Grubbing
3.03 Stripping, Salvaging, and Spreading Topsoil
3.04 Excavation
3.05 Embankment Construction
3.06 Unsuitable Soils
3.07 Subgrade Preparation
3.08 Subgrade Treatment
3.09 Granular Subbase (Class A, B, C, & D)
3.10 Field Quality Control
3.11 Fixture Adjustment
3.12 Temporary Erosion Control During Construction
3.13 Dust Control
3.14 Pavement Replacement

Figures

Details of Embankment and Rebuilding Embankments 2010.1A
Details of Embankment (Allowable Placement Of Unsuitable Material) 2010.1B
Roadway Earthwork 2010.2
Soils Measurement and Recording Devices 2010.3

Home/What's New

Manuals

Meetings

Resources

About SUDAS

Contact

SUDAS Program
2711 S. Loop Drive, Suite 4700, Ames, IA 50010
515-294-2869
FAX: 515-294-0467
Email Beth Richards

SUDAS is a program of the Center for Transportation Research and Education (CTRE), an Iowa State University center.