Division 4: Sewers and Drains

All files are in pdf format. To read pdf files, you may need to download the free Adobe Acrobat Reader.


Section 4010: Sanitary Sewers

Part 1: General

1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment

Part 2: Products

2.01 Sanitary Sewer (Gravity Mains)
2.02 Sanitary Sewer Force Mains
2.03 Casing Pipe
2.04 Sanitary Sewer Services
2.05 Sanitary Sewer Service Relocations
2.06 Sanitary Sewer Cleanout

Part 3: Execution

3.01 Examination
3.02 Gravity Sewer Installation
3.03 Sanitary Sewer Installed within a Casing Pipe
3.04 Gravity Main Pipe Jointing
3.05 Force Main Installation
3.06 Sanitary Sewer Service Stubs
3.07 Sanitary Sewer Service Relocation
3.08 Sanitary Sewer Abandonment
3.09 Connection to Existing Manhole
3.10 Sanitary Sewer Cleanout
3.11 Tolerances
3.12 Conflicts
3.13 Cleaning, Inspection, and Testing

Figures

4010.201 (SW 201) - Sanitary Sewer Service Stub
4010.202 (SW 202) - Sewage Air Release Valve Pit
4010.203 (SW 203) - Sanitary Sewer Cleanout
4010.901 - Relocate Sanitary Sewer Service in Conflict with New Sewer

Back to top

Section 4020: Storm Sewers

Part 1: General

1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment

Part 2: Products

2.01 Storm Sewers
2.02 Casing Pipe

Part 3: Execution

3.01 Examination
3.02 Pipe Installation
3.03 Storm Sewer Installed within a Casing Pipe
3.04 Pipe Jointing
3.05 Tolerances
3.06 Conflicts
3.07 Storm Sewer Abandonment
3.08 Connection to Existing Manhole or Intake
3.09 Cleaning, Inspection, and Testing

Figure

4020.211 (SW 211) - Special Pipe Connections for Storm Sewer

Back to top

Section 4030: Pipe Culverts

Part 1: General

1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment

Part 2: Products

2.01 Pipe Culverts
2.02 Pipe Aprons and Beveled Ends
2.03 Apron Footings
2.04 Apron Guard

Part 3: Execution

3.01 Pipe Culvert Installation
3.02 Aprons
3.03 Cleaning, Inspection, and Testing

Figure

4030.221 - RCP Apron Section Footing

Back to top

Section 4040: Subdrains and Footing Drain Collectors

Part 1: General

1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment

Part 2: Products

2.01 Footing Drain Collectors
2.02 Type 1 Subdrains (Longitudinal Subdrain)
2.03 Type 2 Subdrains (Combination Subdrain/Footing Drain Collector)
2.04 Porous Backfill Material
2.05 Subdrain Outlets
2.06 Subdrain or Footing Drain Cleanouts
2.07 Engineering Fabric
2.08 Storm Sewer Service Stubs

Part 3: Execution

3.01 Subdrains
3.02 Footing Drain Collectors
3.03 Footing Drain Service Stubs

Figures

4040.231 - Subdrains
4040.232 - Subdrain Cleanouts
4040.233 - Subdrain Outlets

Back to top

Section 4050: Pipe Rehabilitation

Part 1: General

1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment

Part 2: Products

2.01 Polyethylene and Polyolefin Manufactured Pipe for Sliplining
2.02 Polyvinyl Chloride Pipe (PVC) Manufactured Pipe 12 inch to 36 inch for Sliplining
2.03 Polyvinyl Chloride Pipe (PVC) Manufactured Pipe 21 inch to 48 inch for Sliplining
2.04 Centrifugally Cast Fiberglass Reinforced Polymer Mortar Pipe (CCFRPM) 18 inch to 48 inch for Sliplining
2.05 Resin-Impregnated Tube for Cured-in-place Pipe (CIPP)
2.06 Deformed/Reformed High Density Polyethylene Pipe Lining (DRP-HDPE)
2.07 Folded/Formed Polyvinyl Chloride Pipe Lining (FFP-PVC)
2.08 Pipe Repair Couplings for Spot Repairs by Pipe Replacement
2.09 Sewer Main Pipe (for Spot Repairs)

Part 3: Execution

3.01 Examination
3.02 Bypassing Sewage
3.03 Obstructions
3.04 Temporary Sewer Service
3.05 Sliplining
3.06 Resin Impregnated CIPP Lining
3.07 DRP-HDPE or FFP-PVC Lining Installation
3.08 Spot Repairs by Pipe Replacement
3.09 Cleanup and Closeout

Back to Top

Section 4060: Cleaning, Inspection, and Testing of Sewers

Part 1: General

1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling
1.07 Special Requirements
1.08 Measurement and Payment

Part 2: Products

2.01 Testing Equipment

Part 3: Execution

3.01 Cleaning
3.02 Visual Inspection
3.03 Video Inspection
3.04 Sanitary Sewer Leakage Testing
3.05 Deflection Testing
3.06 Force Main Testing

Back to top

Page last revised:  January 13, 2010

Home/What's New

Manuals

Meetings

Resources

About SUDAS

Contact

SUDAS Program
2711 S. Loop Drive, Suite 4700, Ames, IA 50010
515-294-2869
FAX: 515-294-0467
Email Beth Richards

SUDAS is a program of the Institute for Transportation at Iowa State University.