Division 5: Water Mains and Appurtenances
All files are in pdf format. To read pdf files, you may need to download the free Adobe Acrobat Reader.
- Section 5010: Pipe and Fittings
- Section 5020: Valves, Fire Hydrants, and Appurtenances
- Section 5030: Testing And Disinfection
Section 5010: Pipe and Fittings
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Submittals
- 1.04 Substitutions
- 1.05 Delivery, Storage, and Handling
- 1.06 Scheduling and Conflicts
- 1.07 Special Requirements
- 1.08 Measurement and Payment
Part 2: Products
- 2.01 Water Main
- 2.02 Bolts for Water Main and Fittings
- 2.03 Fittings
- 2.04 Concrete Thrust Blocks
- 2.05 Pipeline Accessories
- 2.06 Special Gaskets
- 2.07 Water Service Pipe and Appurtenances
2.08 Non-shrink Grout
2.09 Casing Pipe
Part 3: Execution
- 3.01 Pipe Installation
- 3.02 Additional Requirements for Ductile Iron Pipe Installation
- 3.03 Additional Requirements for PVC Pipe Installation
- 3.04 Additional Requirements for Prestressed Concrete Cylinder Pipe Installation
- 3.05 Polyethylene Encasement Installation
- 3.06 Tracer System Installation
- 3.07 Conflicts
- 3.08 Transitions in Piping Systems
- 3.09 Structure Penetrations
- 3.10 Water Service Stub
- 3.11 Testing and Disinfection
Figures
PCC Thrust Blocks 5010.1
Polyethylene Wrap 5010.2
Tracer Wire Detail 5010.3
Minimum Clearance Between Water Service
and Structure 5010.4
Section 5020: Valves, Fire Hydrants, and Appurtenances
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Submittals
- 1.04 Substitutions
- 1.05 Delivery, Storage, and Handling
- 1.06 Scheduling and Conflicts
- 1.07 Special Requirements
- 1.08 Measurement and Payment
Part 2: Products
- 2.01 Valves
- 2.02 Fire Hydrant Assembly
- 2.03 Appurtenances
Part 3: Execution
- 3.01 General
- 3.02 Flushing Device (Blowoff)
- 3.03 Fire Hydrant
Figures
Section 5030: Testing and Disinfection
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling - 1.06 Scheduling and Conflicts
- 1.07 Special Requirements
- 1.08 Measurement and Payment
Part 2: Products
- 2.01 Disinfection Agent - Chlorine
Part 3: Execution
- 3.01 Sequence of Testing and Disinfection
- 3.02 Initial Flushing
3.03 Disinfection
3.04 Final Flushing
3.05 Pressure and Leak Testing
3.06 Bacteria Sampling
3.07 Putting Water Main in Service
Back to top
Page last revised: November 12, 2007