Division 9: Site Work and Landscaping
All files are in pdf format. To read pdf files, you may need to download the free Adobe Acrobat Reader.
- Section 9010: Seeding
- Section 9020: Sodding
- Section 9030: Plant Material and Planting
- Section 9040: Erosion and Sediment Control
- Section 9050: Gabions and Rip Rap
- Section 9060: Fencing
- Section 9070: Retaining Walls
- Section 9080: Concrete Steps and Handrail
Section 9010: Seeding
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Protection of Property
- 1.04 Submittals
- 1.05 Delivery, Storage, and Handling
- 1.06 Scheduling
- 1.07 Acceptance and Warranty
- 1.08 Measurement for Payment
Part 2: Products
- 2.01 Seed
- 2.02 Seed Mixtures and Seeding Dates
- 2.03 Fertilizer
- 2.04 Sticking Agent
- 2.05 Inoculant For Legumes
- 2.06 Water
- 2.07 Mulch
- 2.08 Equipment
Part 3: Execution
- 3.01 Area of Seeding
- 3.02 Finish Grading and Topsoil
- 3.03 Conventional Seeding
- 3.04 Hydraulic Seeding
- 3.05 Pneumatic Seeding
- 3.06 Watering
- 3.07 Re-seeding
- 3.08 Cleanup
Section 9020: Sodding
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Protection of Property
- 1.04 Submittals
- 1.05 Quality Assurance
- 1.06 Delivery, Handling, and Storage
- 1.07 Scheduling
- 1.08 Warranty
- 1.09 Measurement for Payment
Part 2: Products
- 2.01 Sod
- 2.02 Fertilizer
- 2.03 Stakes
- 2.04 Water
Part 3: Execution
- 3.01 Preparation of Sod Bed
- 3.02 Fertilizing - First Application
- 3.03 Sod Installation
- 3.04 Watering
- 3.05 Fertilizing - Second Application
- 3.06 Maintenance
- 3.07 Clean-Up
- 3.08 Acceptance
Section 9030: Plant Material and Planting
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Protection of Property
- 1.04 Submittals
- 1.05 Quality Assurance
- 1.06 Handling and Storage
- 1.07 Scheduling
- 1.08 Plant Material Warranty
- 1.09 Plant Establishment Period and Replacement
- 1.10 Substitutions
- 1.11 Measurement for Payment
Part 2: Products
- 2.01 Plant Materials
- 2.02 Mulch
- 2.03 Planting Soil
- 2.04 Sidewalk Tree Wells Planting Soil
- 2.05 Stakes and Earth Anchors
- 2.06 Staking and Guying Hose
- 2.07 Staking Wire and Guying Cable
- 2.08 Tree Wrapping
- 2.09 Water
- 2.10 Tree Guards and Tree Grates
Part 3: Execution
- 3.01 Optimal Planting Seasons
- 3.02 Preparation
- 3.03 Location of Plants
- 3.04 Excavation of Planting Pit
- 3.05 Planting
- 3.06 Mulching
- 3.07 Wrapping
- 3.08 Staking and Guying
- 3.09 Pruning
- 3.10 Cleanup
- 3.11 Acceptance and Review
Figures
Planting Pit Details 9030.1
Planting On Slopes 9030.2
Tree Staking and Wrapping Deciduous and
Coniferous 9030.3
Tree Guying and Anchor 9030.4
Sidewalk Tree Well 9030.5
Planting Well Blind Drain Detail 9030.6
Section 9040: Erosion and Sediment Control
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Protection of Property
1.06 Scheduling
1.07 Iowa DNR NPDES General Permit No. 2
1.08 Measurement for Payment
Part 2: Products
- 2.01 Filter Material
- 2.02 Filter Sock
- 2.03 Compost Blankets
- 2.04 Compost Blanket and Filter Berm Tackifier
2.05 Silt Fence
2.06 Dust Control
2.07 Erosion Control Mulch
2.08 Temporary Rolled Erosion Control Products (RECP)
2.09 Turf Reinforcement Mats (TRM)
2.10 Wattles
2.11 Check Dams
2.12 Level Spreaders
2.13 Temporary Pipe Slope Drains
2.14 Flow Transition Mats
2.15 Sediment Basin Outlet Structures
2.16 Sediment Traps
2.17 Inlet Protection
2.18 Engineering Fabric
2.19 Revetment and Erosion Stone
2.20 Stabilized Construction Entrance
Part 3: Execution
- 3.01 SWPPP Preparation
- 3.02 SWPPP Management
- 3.03 Erosion and Sediment Control Inspection
- 3.04 Compost Blankets
- 3.05 Filter Berms
- 3.06 Filter Socks
- 3.07 Silt Fences
3.08 Dust Control
3.09 Temporary Erosion Control Seeding
3.10 Erosion Control Mulching
3.11 Surface Roughening
3.12 Temporary Rolled Erosion Control Products
3.13 Turf Reinforcement Mats
3.14 Wattles
3.15 Check Dams
3.16 Level Spreaders
3.17 Temporary Earth Diversion Structures
3.18 Temporary Slope Drains
3.19 Flow Transition Mats
3.20 Sediment Basin Outlet Structures
3.21 Sediment Traps
3.22 Inlet Protection
3.23 Rock Outlet Protection
3.24 Stabilized Construction Entrance
3.25 Maintenance
Figures
Compost Blanket 9040.1
Filter Berm & Filter Sock 9040.2
Rolled Erosion Control Product (RECP) Installation on Slopes 9040.3
Rolled Erosion Control Prodcut (RECP) Installation in Channel 9040.4
Wattle 9040.5
Check Dam Spacing 9040.6
Rock Check Dam 9040.7
Temporary Earth Diversion Structures 9040.8
Level Spreader 9040.9
Rock Apron for Pipe Outlet onto Flat Ground 9040.10
Rock Apron for Pipe Outlet into Channel 9040.11
Temporary Pipe Slope Drain 9040.12
Sediment Basin without Emergency Spillway 9040.13
Sediment Basin with Emergency Spillway 9040.14
Sediment Basin Dewatering Device (Perforated Riser) 9040.15
Stabilized Construction Entrance 9040.20
Section 9050: Gabions and Rip Rap
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Submittals
- 1.04 Substitutions
- 1.05 Delivery, Storage, and Handling
- 1.06 Scheduling and Conflicts
- 1.07 Special Requirements
- 1.08 Measurement for Payment
Part 2: Products
- 2.01 Materials
Part 3: Execution
- 3.01 Bedding and Backfill
- 3.02 Assembly
- 3.03 Installation
Figures
Section 9060: Fencing
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Protection of Property
- 1.04 Submittals
- 1.05 Quality Assurance
- 1.06 Scheduling
- 1.07 Measurement for Payment
Part 2: Products
- 2.01 Materials
- 2.02 Fabric
- 2.03 Posts, Rails, and Braces
- 2.04 Fittings
- 2.05 Bottom Tension Wire
- 2.06 Fasteners
- 2.07 Barbed Wire Supporting Arms
- 2.08 Barbed Wire
- 2.09 Gates
- 2.10 Concrete
Part 3: Execution
- 3.01 Chain Link Fencing Installation
- 3.02 Removal and Replacement of Existing Fences
- 3.03 Temporary Fence
- 3.04 Cleanup
Figures
Chain Link Fence Installation Details
9060.1
Chain Link Fence Details 9060.2
Chain Link Gate Details 9060.3
Section 9070: Retaining Walls
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Submittals
- 1.04 Substitutions
- 1.05 Delivery, Storage, and Handling
- 1.06 Scheduling and Conflicts
- 1.07 Special Requirements
- 1.08 Measurement for Payment
Part 2: Products
- 2.01 Materials
Part 3: Execution
- 3.01 Excavation
- 3.02 Foundation
- 3.03 Installation
- 3.04 Characteristic
Figures
Dry Walls 9070.1
Tree Dry Wells 9070.2
Retaining Walls Adjacent to Driveways
9070.3
Railroad Tie Walls & Landscape Timber
Walls 9070.4
Modular Block Masonry Wall 9070.5
Combined Retaining Wall - Sidewalk 9070.6
Section 9080: Concrete Steps and Handrail
Part 1: General
- 1.01 Section Includes
- 1.02 Description of Work
- 1.03 Submittals
- 1.04 Substitutions
- 1.05 Delivery, Storage, and Handling
- 1.06 Scheduling and Conflicts
- 1.07 Special Requirements
- 1.08 Measurement for Payment
Part 2: Products
- 2.01 Materials
Part 3: Execution
- 3.01 Installation
Figures
Type "A" Concrete Steps With Handrail
9080.1
Type "B" Concrete Steps With Handrail
9080.2
Page last revised: November 12, 2007

